Skyline Developers
Skyline Palm Meadows
Ready To Move RERA: P172711/87125/136928

Skyline Palm Meadows

Bengaluru, Karnataka · by Skyline Developers

2BHK, 3BHK ₹3,797,105 - ₹5,218,068 Download Brochure

For reference only — please verify on the official RERA website before investing.

6

Total Towers

21

Total Floors

352

Total Units

5 acres

Land Area

Apr 2027

Possession

Overview

About Skyline Palm Meadows

Consequatur qui amet quasi animi aut sequi. Voluptatem et sit quibusdam aut odio. Voluptates exercitationem est aperiam quis est nulla. Aliquam qui molestiae voluptatem est voluptatem molestiae magnam blanditiis. Aliquid facilis error vel omnis tempora nulla in. Voluptas ab maxime qui rerum sed quasi et. Minus nostrum ipsa quas natus sed dolorem sed voluptatem. Enim sed provident aut non officiis molestiae. Totam molestiae officia harum ex laudantium ut voluptates.

  • 2BHK · 1100 sqft
  • 3BHK · 1450 sqft

Last updated: 13 Sep 2026

Amenities

Everything you need, close to home

Fully-Equipped Gym

Fully-Equipped Gym

Covered Parking

Covered Parking

Clubhouse

Clubhouse

Children's Play Area

Children's Play Area

Power Backup

Power Backup

High-Speed Wi-Fi Zones

High-Speed Wi-Fi Zones

Indoor Games Room

Indoor Games Room

Rainwater Harvesting

Rainwater Harvesting

Floor Plans

Choose the layout that fits your life

Skyline Palm Meadows 2BHK floor plan

2BHK

1100

₹3,797,105
Skyline Palm Meadows 3BHK floor plan

3BHK

1450

₹4,597,105

Construction Updates

Progress on site

August 2026

Finishing & Interior Work

Finishing & Interior Work. Interior finishing, flooring, electrical and plumbing fit-outs are in progress ahead of handover.

June 2026

Superstructure & Facade Work

Superstructure & Facade Work. The building superstructure is topped up and exterior facade, brickwork and plastering are underway.

March 2026

Structural Framework in Progress

Structural Framework in Progress. RCC framework and slab casting are progressing across the lower floors, with columns and beams taking shape.

January 2026

Foundation & Excavation Complete

Foundation & Excavation Complete. Site excavation and foundation work have been completed, with piling and raft foundation laid as per structural design.

Location

Well-connected, beautifully secluded

International School

6 mins

Business District

15 mins

National Highway Access

3 mins

Tech Park / IT Hub

10 mins

Multi-Specialty Hospital

8 mins

Documents & Downloads

Everything you need to review

FAQs

Common questions

Is this project RERA registered?

Yes, Skyline Palm Meadows is registered under RERA with all approvals in place, and the registration number is available on the project brochure and disclosure documents.

What are the possession timelines?

Possession for Skyline Palm Meadows is expected as per the date mentioned on the project page, subject to standard construction timelines.

What financing options are available?

Home loans from all leading nationalised and private banks are available for Skyline Palm Meadows, with the developer assisting in loan documentation.

What is included in the unit price?

The listed price for Skyline Palm Meadows covers the base unit cost; other charges such as registration, GST, and maintenance deposits apply separately as per the cost sheet.

Are the amenities ready to use?

Common amenities at Skyline Palm Meadows are being developed in phases alongside construction and will be ready before possession handover.

Builder

Skyline Developers

Enquire Now

Get in Touch

Resident Type

Skyline Palm Meadows, Bengaluru

Enquire Now

Get in Touch

Resident Type
Compare