2

Total Towers

28

Total Floors

312

Total Units

3.2 acres

Land Area

Dec 2027

Possession

148 of 312 units sold

164 units available

About Skyline Horizon Business Centre

Skyline Horizon Business Centre is a landmark Grade-A commercial development in the heart of Bandra Kurla Complex — Mumbai's most sought-after business address. Twin 28-storey glass towers offer column-free office suites from 1,050 sq ft to full half-floors of 6,200 sq ft, with double-height lobbies, 6 high-speed elevators per tower and a triple-level podium of retail and food courts. Designed to IGBC Platinum standards, the campus features 100% power backup, central chilled-water air conditioning, a rooftop business lounge and dedicated valet parking. With the BKC Metro station a four-minute walk away and direct access to the Western Express Highway and the Sea Link, Horizon puts your team minutes from every part of the city.

  • Office Suite · 1050 sqft
  • Executive Suite · 2100 sqft
  • Half Floor · 6200 sqft

Last updated: 19 Sep 2026

Amenities

Fully-Equipped Gym

Fully-Equipped Gym

Landscaped Garden

Landscaped Garden

24x7 Security

24x7 Security

Covered Parking

Covered Parking

Clubhouse

Clubhouse

Power Backup

Power Backup

High-Speed Wi-Fi Zones

High-Speed Wi-Fi Zones

Rainwater Harvesting

Rainwater Harvesting

EV Charging Points

EV Charging Points

Co-working Lounge

Co-working Lounge

Floor Plans

Skyline Horizon Business Centre — Office Suite floor plan

Office Suite

1050

₹2,85,00,000
Skyline Horizon Business Centre — Executive Suite floor plan

Executive Suite

2100

₹5,68,00,000
Skyline Horizon Business Centre — Half Floor floor plan

Half Floor

6200

₹9,60,00,000

Construction Updates

August 2026

Facade & Interior Works Commence

Facade & Interior Works Commence. Facade installation and internal plastering are in progress ahead of flooring and finishing; clubhouse structure is topped out.

June 2026

Superstructure & Brickwork Under Way

Superstructure & Brickwork Under Way. The superstructure has crossed the mid-rise level; block-work, MEP first-fix and external plastering have started on the lower floors.

February 2026

Structural Frame Rising

Structural Frame Rising. Columns, beams and slabs are progressing floor by floor on a 7-day slab cycle, with the podium level now cast.

November 2025

Excavation & Foundation Complete

Excavation & Foundation Complete. Site excavation, piling and the raft foundation were completed and cured; structural drawings for the podium were signed off.

Location

BKC Metro Station (Line 2B)

4 mins

Jio World Convention Centre

6 mins

Bandra Railway Station

12 mins

Chhatrapati Shivaji Maharaj Int'l Airport

20 mins

Lilavati Hospital

14 mins

Bandra-Worli Sea Link

10 mins

Documents & Downloads

FAQs

Is Skyline Horizon Business Centre RERA registered?

Yes. The project is registered under RERA with registration number P51800048231. You can verify the registration, approved plans and quarterly progress reports on the state RERA website.

What is the expected possession date?

Possession is planned for December 2027 as per the RERA-approved timeline, with a six-month grace period built into the agreement. Quarterly construction updates are shared on this page.

What is the starting price and what does it include?

Prices start at ₹2.85 Cr (all-inclusive base price). GST as applicable, stamp duty, registration and society/maintenance deposits are payable separately as per the cost sheet shared at booking.

Which banks offer home loans for this project?

Approved by SBI, HDFC, ICICI, Axis Bank and Bank of Baroda. Our in-house finance desk helps with documentation and can arrange a sanction letter within 3–5 working days. Eligible buyers can also claim the interest subsidy under PMAY.

Can NRIs buy in this project?

Yes. NRIs and OCI cardholders can purchase under FEMA guidelines using funds remitted through NRE/NRO accounts. Our NRI desk assists with power of attorney, tax residency and repatriation paperwork.

Are the homes Vaastu compliant and how many parking slots are included?

Layouts are designed with Vaastu principles (east/north-facing options available). Each home includes at least one dedicated covered car-parking slot; additional slots can be purchased subject to availability.

Builder

Skyline Developers

संपर्क करें

निवासी प्रकार

Skyline Horizon Business Centre, Mumbai

संपर्क करें

निवासी प्रकार

Skyline Horizon Business Centre, Mumbai

साइट विज़िट बुक करें

तारीख़ और समय चुनें — हम आपकी साइट विज़िट कन्फ़र्म करेंगे।

समय स्लॉट चुनें
तुलना करें